Skip to Content

Honoring our past. Designing our future. Welcome to KCA’s new look.

HomeProjects

Whiting Street Improvements

Owner: Tampa Hillsborough Expressway Authority (THEA)
Location: Tampa, FL
Construction site in a city with skyscrapers and a major road nearby
Whiting Street
Elevated highway with light traffic, city buildings nearby, sign indicating direction to St. Petersburg
Whiting Street
Aerial view of highways, looped road, and Pam Iorio Parking Garage
Whiting Street
Elevated highway in urban area, surrounded by buildings and intersections, aerial view
Whiting Street
Cityscape with several skyscrapers, elevated highway, and scattered vehicles in a sunny urban setting
Whiting Street
Urban landscape with highways, buildings, and cranes under a clear blue sky
Whiting Street
Elevated highway in a city with surrounding buildings and parking lots
Whiting Street

As part of the Tampa Hillsborough Expressway Authority’s efforts to enhance mobility and connectivity in Downtown Tampa, KCA is serving as the lead designer for the Whiting Street Improvements project. The project builds upon a Project Development and Environment (PD&E) Study completed in 2024 that evaluated transportation needs, costs, and potential impacts associated with improving connections from THEA’s Selmon Expressway corridor to the Channel District east of Meridian Avenue and south toward Port Tampa and Water Street Tampa.

In coordination with the City of Tampa, the study identified a preferred alternative that extends Whiting Street to Meridian Avenue. This alternative includes reconfiguring the eastbound Selmon Expressway exit ramp to Florida Avenue by removing the existing direct connection to Channelside Drive, as well as widening the Selmon Expressway to accommodate a new eastbound exit ramp to Whiting Street. The proposed improvements require new bridge structures over Morgan Street, Brorein Street, and Jefferson Street, along with supporting surface street modifications, including realignment of THEA’s Selmon Expressway entrance ramp at Jefferson Street.

KCA’s design for Whiting Street focuses on enhancing traffic operations, safety, and multimodal connectivity. Improvements include new signalized intersections at the Selmon Expressway exit ramp, Brush Street, and Meridian Avenue, along with a complete street typical section that incorporates a bi-directional, two-way cycle track separated by a raised buffer. Ten-foot-wide sidewalks are provided on both sides of the roadway, with direct connections to THEA’s Selmon Greenway and the Meridian Greenway Trail network, creating a safer and more accessible corridor for motorists, pedestrians, and bicyclists alike.

Focus Areas

  • Environmental Services
  • Roadway Design
  • Structures Design
  • Traffic Engineering
  • Public Involvement
  • Hydraulics Design

Recent Projects

Williams Road Southern Swale Analysis

Estero, FL

As part of the Willliams Road Improvements, KCA is assisting with drainage and stormwater analysis and maintenance of the southern swale along Williams Road from…

Williams Road Roundabout

Estero

KCA was selected by the Village of Estero to provide design and permitting services for the roadway and intersection improvements along Williams Road at Atlantic…

SR 679 (Pinellas Bayway) Structure E over Intracoastal Waterway, Design-Build (D/B)

Pinellas County, FL

As a partner to American Bridge Company and American Consulting Professionals, KCA was selected for the SR 679 (Pinellas Bayway) Structure E over the Intracoastal…