Skip to Content

Honoring our past. Designing our future. Welcome to KCA’s new look.

HomeProjects

Our Projects

Every project we deliver tells a story of collaboration, innovation, and impact. At KCA, we take pride in designing and inspecting transportation infrastructure that improves how people move, connect, and thrive within communities.

Whiting Street Improvements

Tampa, FL

As part of the Tampa Hillsborough Expressway Authority’s efforts to enhance mobility and connectivity in Downtown Tampa, KCA is serving as the lead designer for…

US 92 County Line Road from Amberjack Boulevard to Frontage Road (South) PD&E Study

Polk County, FL

KCA is performing feasibility and PD&E studies for this corridor, which is utilized by distribution, manufacturing, and transport facilities in the area. The CSX at…

SR 70 from CR 29 to Lonesome Island Road PD&E Study

Highlands County, FL

KCA was selected by FDOT District One for the PD&E Study of SR 70 from CR 29 to Lonesome Island Road in Highlands County. For…

McIntosh Road PD&E Study & Design

Hillsborough County, FL

KCA provided public involvement services and completed the environmental document for FDOT District Seven to conduct a PD&E study of McIntosh Road from south of…

Tanglewood/Bayou Grande Bridge Replacement

St Petersburg, FL

This project consisted of the replacement of the existing Tanglewood Bridge servicing Bayou Grande Boulevard northeast over Tanglewood Canal in Pinellas County, FL. The 67-year-old…

Williams Road from US 41 to Via Coconut Point

Lee County, FL

KCA is providing professional consultant services to study Williams Road from US 41 to Via Coconut Point to identify future widening needs. Williams Road from…

Maydell Drive Bridge Replacement

Tampa, FL

This Hillsborough County/FDOT District Seven Local Agency Program (LAP) project consisted of replacing the existing 616-foot bridge, reconstructing the roadway approaches, and providing pedestrian connectivity.…

16th Street NE Bridge Design

Naples, FL

KCA was selected to design the bridge and roadway improvements along 16th Street NE from Golden Gate Boulevard W. to Randall Boulevard in Naples, FL.…

North Sarasota Multi-Modal Connector

Sarasota County, FL

KCA is developing the traffic analysis and Interchange Modification Report (IMR) to assess the impact of a new I-75 overpass on the adjacent two interchanges…

Trusted by the Best in Transportation

A testament to KCA’s quality and dedication, more than 90% of our work comes from repeat clients, including state DOTs, cities, counties, and transportation agencies across the Southeast. We value these relationships (whether long-standing, newly formed, or actively developing) and remain committed to delivering exceptional service, trusted collaboration, and proven results on every project.