Ridge Road Extension – Phase 2B (Sunlake Boulevard to US 41) Phased Design-Build (PDB)

Construction site clearing through dense forest, aerial view
Ridge Road Extension
Error: Timeout while downloading https://kca.1.aordev.com/wp-content/uploads/2025/12/Ridge-Road-Extension-Phase-2B-5-6-24-04.jpg.
Ridge Road Extension
Aerial view of a road construction site through dense green forest adjacent to residential area
Ridge Road Extension
Cleared land next to suburban houses and dense green forest
Ridge Road Extension
Aerial view of Ridge Road Extension Phase 2B construction site surrounded by dense forest
Ridge Road Extension
Aerial view of a forest clearing, construction site with vehicles and smoke
Ridge Road Extension
Aerial view of Ridge Road Extension construction phase, surrounded by neighborhoods, woods, and ponds; machinery on site
Ridge Road Extension Phase 2B
Aerial view of road construction with heavy machinery surrounded by trees and ponds
Ridge Road Extension Phase 2B
Aerial view of Ridge Road Extension construction surrounded by dense forest and ponds, showing ongoing roadwork and machinery
Ridge Road Extension Phase 2B
Aerial view of a construction site with excavators near a pond, surrounded by dense trees
Ridge Road Extension Phase 2B

The Cone & Graham/KCA Team was selected by Pasco County (FL) to deliver Phase 2B of the Ridge Road Extension, the final and most complex segment of this critical east–west mobility corridor. Delivered through a phased design-build (PDB) approach, this project enhances regional connectivity, increases roadway capacity, and supports long-term growth in one of Pasco County’s fastest-developing areas.

Phase 2B includes the design and construction of a four-lane divided urban roadway featuring new retaining walls, stormwater and drainage systems, and multimodal improvements. A key structural element of the project is the construction of two new parallel steel plate girder bridges over the CSX rail corridor, providing a grade-separated crossing that improves safety and operational reliability.

Additional improvements include new traffic signals and intersection modifications at both Sunlake Boulevard and US 41, enhancing traffic flow and improving safety at these major crossroads. The project also delivers significant utility infrastructure, including installation of a 24-inch water main and 20-inch reclaimed water main, improving system reliability and supporting future development in the region.

Once complete, the Ridge Road Extension will serve as a vital hurricane evacuation route and a major east–west connection for residents, businesses, and emergency services—strengthening mobility and resilience throughout Pasco County.

Focus Areas

  • Alternative Delivery
  • Roadway Design
  • Structures Design
  • Drainage Design
  • Traffic Engineering
  • Environmental Permitting

Recent Projects

Williams Road Southern Swale Analysis

Estero, FL

As part of the Willliams Road Improvements, KCA is assisting with drainage and stormwater analysis and maintenance of the southern swale along Williams Road from…

Williams Road Roundabout

Estero

KCA was selected by the Village of Estero to provide design and permitting services for the roadway and intersection improvements along Williams Road at Atlantic…

SR 679 (Pinellas Bayway) Structure E over Intracoastal Waterway, Design-Build (D/B)

Pinellas County, FL

As a partner to American Bridge Company and American Consulting Professionals, KCA was selected for the SR 679 (Pinellas Bayway) Structure E over the Intracoastal…