HomeProjects
Our Projects
Every project we deliver tells a story of collaboration, innovation, and impact. At KCA, we take pride in designing and inspecting transportation infrastructure that improves how people move, connect, and thrive within communities.
Emergency Express Design-Build Bridge Replacements
Columbus, NC
Tara Group of Lumberton, Inc. (Tara Group) and KCA partnered to perform an emergency express design-build (D-B) bridge replacement in NCDOT Division 6 after Hurricane…
George Bean Parkway Widening and Return to Terminal Recirculation Bridge
Tampa International Airport
This project included the design and construction of the widening of the George Bean Parkway to provide an additional lane into and out of Tampa…
I-4 Mainline from E of World Drive to E of US 192, Modified Phased Design-Build (MPDB)
Central Florida
The Superior Construction–MasTec Civil Joint Venture was selected as the lead Contractor, with KCA serving as the lead Designer, for this $367 million project. This…
Tampa Westshore Interchange (TWI) Phased Design-Build (PDB)
Tampa, FL
The TWI PDB project encompasses Sections 4 and 5 of the Tampa Bay Next (TBNext) program. The selected alternative was advanced from Concept through the…
SR 56 Extension from Meadow Pointe Boulevard to US 301 Design-Build
Pasco County, FL
KCA served as the lead design and environmental consultant to Cone & Graham, Inc. for the design-build delivery of the new 6.1-mile extension of SR…
Ridge Road Extension – Phase 2B (Sunlake Boulevard to US 41) Phased Design-Build (PDB)
Pasco County, FL
The Cone & Graham/KCA Team was selected by Pasco County (FL) to deliver Phase 2B of the Ridge Road Extension, the final and most complex…
Gateway Expressway, Segment 1, Design-Build
Pinellas County, FL
The $585 million Gateway Expressway Design-Build project is the most significant transportation project in Pinellas County, FL since the expansion of US 19. This project…
NCDOT Ongoing General Engineering Services Contract (GESC) Tasks: Hydraulics, Alternative Delivery-Divisions 1,2,4,10, and 11
North Carolina
KCA has worked as a GESC in Divisions 1, 4, and 11 over the past three years and was more recently selected to work as…
Sanibel Causeway Emergency Repairs Phased Design-Build (PDB)
Lee County, FL
In the aftermath of Hurricane Ian, the Sanibel Causeway sustained damage to such an extent that it was impassible by land. The two islands that…
Trusted by the Best in Transportation
A testament to KCA’s quality and dedication, more than 90% of our work comes from repeat clients, including state DOTs, cities, counties, and transportation agencies across the Southeast. We value these relationships (whether long-standing, newly formed, or actively developing) and remain committed to delivering exceptional service, trusted collaboration, and proven results on every project.