Skip to Content

Honoring our past. Designing our future. Welcome to KCA’s new look.

HomeProjects

Whiting Street Improvements

Owner: Tampa Hillsborough Expressway Authority (THEA)
Location: Tampa, FL
Urban construction site with cleared land, adjacent to a multilane road and city skyline in the background
Whiting Street
Elevated highway with traffic, large building, and sign for St. Petersburg
Whiting Street
Aerial view of Pam Iorio Parking Garage, roads, and greenery
Whiting Street
Aerial view of a highway interchange in an urban area with several cars
Whiting Street
Aerial view of a cityscape with a highway, tall buildings, and a sunny sky
Whiting Street
Highway overpass with light traffic amid urban landscape, surrounded by buildings and parked cars
Whiting Street
Aerial view of a highway overpass through a cityscape with buildings and construction cranes, Lema and The Plug signs visible
Whiting Street
Highway overpass with flowing traffic, adjacent city landscape, and parking lots
Whiting Street

As part of the Tampa Hillsborough Expressway Authority’s efforts to enhance mobility and connectivity in Downtown Tampa, KCA is serving as the lead designer for the Whiting Street Improvements project. The project builds upon a Project Development and Environment (PD&E) Study completed in 2024 that evaluated transportation needs, costs, and potential impacts associated with improving connections from THEA’s Selmon Expressway corridor to the Channel District east of Meridian Avenue and south toward Port Tampa and Water Street Tampa.

In coordination with the City of Tampa, the study identified a preferred alternative that extends Whiting Street to Meridian Avenue. This alternative includes reconfiguring the eastbound Selmon Expressway exit ramp to Florida Avenue by removing the existing direct connection to Channelside Drive, as well as widening the Selmon Expressway to accommodate a new eastbound exit ramp to Whiting Street. The proposed improvements require new bridge structures over Morgan Street, Brorein Street, and Jefferson Street, along with supporting surface street modifications, including realignment of THEA’s Selmon Expressway entrance ramp at Jefferson Street.

KCA’s design for Whiting Street focuses on enhancing traffic operations, safety, and multimodal connectivity. Improvements include new signalized intersections at the Selmon Expressway exit ramp, Brush Street, and Meridian Avenue, along with a complete street typical section that incorporates a bi-directional, two-way cycle track separated by a raised buffer. Ten-foot-wide sidewalks are provided on both sides of the roadway, with direct connections to THEA’s Selmon Greenway and the Meridian Greenway Trail network, creating a safer and more accessible corridor for motorists, pedestrians, and bicyclists alike.

Focus Areas

  • Environmental Services
  • Roadway Design
  • Structures Design
  • Traffic Engineering
  • Public Involvement
  • Hydraulics Design

Recent Projects

Emergency Express Design-Build Bridge Replacements

Columbus, NC

Tara Group of Lumberton, Inc. (Tara Group) and KCA partnered to perform an emergency express design-build (D-B) bridge replacement in NCDOT Division 6 after Hurricane…

SR 417 Widening from Narcoosee Road to North of SR 528 (CFX 417-150)

Orange County, FL

This $100 million CEI project consists of widening SR 417 from four general use lanes to six general use lanes and two part-time shoulder running…

George Bean Parkway Widening and Return to Terminal Recirculation Bridge

Tampa International Airport

This project included the design and construction of the widening of the George Bean Parkway to provide an additional lane into and out of Tampa…