This $100 million CEI project consists of widening SR 417 from four general use lanes to six general use lanes and two part-time shoulder running lanes. All mainline bridges within the project limits will be widened, including: OUC Railroad bridge, Moss Park Road, Dowden Road, over the SR 417 SB to SR 528 EB ramp and over SR 528. The work also includes, replacement of one ramp toll plaza, construction of sound barriers, retaining walls, overhead sign structures and intelligent transportation systems infrastructure and lighting improvements. Project was completed Spring of 2024.
Focus Areas
- CEI
Recent Projects
Williams Road Southern Swale Analysis
Estero, FL
As part of the Willliams Road Improvements, KCA is assisting with drainage and stormwater analysis and maintenance of the southern swale along Williams Road from…
Williams Road Roundabout
Estero
KCA was selected by the Village of Estero to provide design and permitting services for the roadway and intersection improvements along Williams Road at Atlantic…
SR 679 (Pinellas Bayway) Structure E over Intracoastal Waterway, Design-Build (D/B)
Pinellas County, FL
As a partner to American Bridge Company and American Consulting Professionals, KCA was selected for the SR 679 (Pinellas Bayway) Structure E over the Intracoastal…