I-4 Mainline from E of World Drive to E of US 192, Modified Phased Design-Build (MPDB)

Owner: FDOT Corridors Program Office
Location: Central Florida
Aerial view of multi-lane highway interchange with surrounding ponds and greenery, under a partly cloudy sky
I-4 Mainline
Aerial view of a highway interchange with surrounding greenery and buildings in the distance
I-4 Mainline
Highway with moderate traffic, surrounded by greenery, under partly cloudy sky
I-4 Mainline
Aerial view of a highway with sparse traffic, flanked by green fields and trees
I-4 Mainline
Aerial view of a highway beside a commercial area and dense forestland, under a cloudy sky
I-4 Mainline
Aerial view of a highway intersection surrounded by trees, buildings, and parking lots under a cloudy sky
I-4 Mainline
Aerial view of highways, overpasses, and green spaces with surrounding forests and parked cars
I-4 Mainline
Aerial view of a highway interchange surrounded by greenery and city buildings in the background
I-4 Mainline
Aerial view of a highway interchange with looping overpasses, surrounded by forests, ponds, and urban structures in the background
I-4 Mainline
Aerial view of a highway intersection with multiple overpasses surrounded by trees and small ponds
I-4 Mainline

The Superior Construction–MasTec Civil Joint Venture was selected as the lead Contractor, with KCA serving as the lead Designer, for this $367 million project. This will be FDOT’s first MPDB project delivery. The project reconstructs the I-4 (SR 400) mainline and improves the SR 417 and US 192 interchanges to increase capacity, enhance mobility, and support long-term corridor performance.

Major elements include new express lane direct-connect ramps; construction of new bridges and retaining walls; reconstruction and widening of ramps and the collector-distributor system; and milling and resurfacing of SR 417. The scope also expands stormwater ponds, installs new drainage systems, and rehabilitates cross drains, while preserving the I-4 median for future high-speed rail.

Additional corridor-wide improvements include new lighting, signing and pavement markings (S&PM), Intelligent Transportation Systems (ITS) and Connected and Automated Vehicle (CAV) infrastructure, noise walls, and permanent tolling facilities. The project also includes construction of a new All-Electronic Tolling (AET) facility and demolition of the existing Celebration Plaza toll plaza. Aesthetic enhancements, landscape opportunity planning, and replacement of deficient elements complete the work, positioning the corridor for future operations and growth.

Focus Areas

  • Alternative Delivery
  • Roadway Design
  • Structures Design
  • Hydraulics Design
  • Traffic Engineering
  • Environmental & Permitting Services

Recent Projects

Whiting Street Improvements

Tampa, FL

As part of the Tampa Hillsborough Expressway Authority’s efforts to enhance mobility and connectivity in Downtown Tampa, KCA is serving as the lead designer for…

Emergency Express Design-Build Bridge Replacements

Columbus, NC

Tara Group of Lumberton, Inc. (Tara Group) and KCA partnered to perform an emergency express design-build (D-B) bridge replacement in NCDOT Division 6 after Hurricane…

SR 417 Widening from Narcoosee Road to North of SR 528 (CFX 417-150)

Orange County, FL

This $100 million CEI project consists of widening SR 417 from four general use lanes to six general use lanes and two part-time shoulder running…