Skip to Content

Honoring our past. Designing our future. Welcome to KCA’s new look.

HomeProjects

George Bean Parkway Widening and Return to Terminal Recirculation Bridge

Owner: Hillsborough County Aviation Authority
Location: Tampa International Airport
Overpass with landscaped area, palm trees, fire hydrant, and clear sky
George Bean Parkway
Aerial view of a recirculation bridge near an airport terminal, surrounded by roads and a water fountain below
George Bean Parkway
Concrete retaining wall under construction alongside a highway, traffic visible in the distance
George Bean Parkway
Aerial view of George-Bean-Pkwy construction progress, roads curving, vehicles moving, green spaces, and nearby airport
George Bean Parkway
Wide highway with vehicles under clear sky, airplane overhead, orange construction cones present

This project included the design and construction of the widening of the George Bean Parkway to provide an additional lane into and out of Tampa International Airport, as well as around the terminal. It also included the design and construction of the Red Side Recirculation Bridge along with drainage improvements, signing and pavement marking (S&PM), and milling and resurfacing of all asphalt surfaces. Additionally, the project included a traffic study and concept layout for the transportation improvements necessary to support the proposed north terminal. The overall project design and construction cost was $30.3 million.

Focus Areas

  • Alternative Delivery
  • Structures Design
  • Roadway Design
  • Hydraulics Design
  • Traffic Engineering
  • Environmental Services

Recent Projects

Whiting Street Improvements

Tampa, FL

As part of the Tampa Hillsborough Expressway Authority’s efforts to enhance mobility and connectivity in Downtown Tampa, KCA is serving as the lead designer for…

Emergency Express Design-Build Bridge Replacements

Columbus, NC

Tara Group of Lumberton, Inc. (Tara Group) and KCA partnered to perform an emergency express design-build (D-B) bridge replacement in NCDOT Division 6 after Hurricane…

SR 417 Widening from Narcoosee Road to North of SR 528 (CFX 417-150)

Orange County, FL

This $100 million CEI project consists of widening SR 417 from four general use lanes to six general use lanes and two part-time shoulder running…