Skip to Content

Honoring our past. Designing our future. Welcome to KCA’s new look.

HomeProjects

Gateway Expressway, Segment 1, Design-Build

Owner: FDOT District Seven
Location: Pinellas County, FL
Aerial view of Pinellas Gateway Expressway showcasing multiple highway overpasses and surrounding greenery, leading towards a distant water body
Gateway Expressway
Aerial view of Pinellas Gateway Expressway with multiple lanes, greenery, and nearby buildings
Gateway Expressway
Aerial view of multi-level highway interchange with vehicles; green surroundings and nearby buildings visible in background
Gateway Expressway

The $585 million Gateway Expressway Design-Build project is the most significant transportation project in Pinellas County, FL since the expansion of US 19. This project is a critical part of the Tampa Bay Area’s growing transportation network as it will provide much needed limited and controlled access connections from CR 611 on the north side, US 19 on the west side, and the St. Pete/Clearwater International Airport to I-275.

The project included the first section of Tampa Bay’s Next Network by constructing the initial segment of the Express Lanes on I-275. Overall project improvements included upgraded interchanges and grade separations with new ramps, bridges, and flyovers; enhancements to arterial surface roads; various intersection renovations; and utility improvements. KCA provided MOT, roadway and structures design, drainage, and signing and pavement markings (S&PM) services for this fast-paced expansive project. A safety and crash analysis was performed along with a conceptual ramp design and a Pond Siting Report. After the District received approval of the Interchange Operational Analysis Report (IOAR), KCA completed final design including a new two-lane exit ramp, ramp lighting, drainage improvements, and signal modifications.

Focus Areas

  • Alternative Delivery
  • Roadway Design
  • Structures Design
  • Traffic Engineering
  • Drainage Engineering

Recent Projects

Whiting Street Improvements

Tampa, FL

As part of the Tampa Hillsborough Expressway Authority’s efforts to enhance mobility and connectivity in Downtown Tampa, KCA is serving as the lead designer for…

Emergency Express Design-Build Bridge Replacements

Columbus, NC

Tara Group of Lumberton, Inc. (Tara Group) and KCA partnered to perform an emergency express design-build (D-B) bridge replacement in NCDOT Division 6 after Hurricane…

SR 417 Widening from Narcoosee Road to North of SR 528 (CFX 417-150)

Orange County, FL

This $100 million CEI project consists of widening SR 417 from four general use lanes to six general use lanes and two part-time shoulder running…