Skip to Content

Honoring our past. Designing our future. Welcome to KCA’s new look.

HomeProjects

Design Build I-75 ADMS Deployment

Owner: Transcore & FDOT District One
Location: Sarasota County, FL
Street view with labeled coordinates, date, time; bike lane indicated
Design-Build I-75
Traffic at intersection with timestamp and coordinates; Manatee County, State Road 64
Design-Build I-75
Traffic at intersection with cars and truck, location details overlayed, Manatee County
Design-Build I-75

For this project, KCA is tasked with designing four Arterial Dynamic Message Signs (ADMS) in advance of I-75 at the SR 64 and SR 70 interchanges in Manatee County, FL. The project included the design, permitting, procurement, and construction of the ADMS, fiber optic cable, conduit, pull and splice boxes, verification closed-circuit television (VCCTV) cameras, power subsystem infrastructure, and device integration. This project is currently under construction.

Focus Areas

  • Traffic Engineering

Recent Projects

Williams Road Southern Swale Analysis

Estero, FL

As part of the Willliams Road Improvements, KCA is assisting with drainage and stormwater analysis and maintenance of the southern swale along Williams Road from…

Williams Road Roundabout

Estero

KCA was selected by the Village of Estero to provide design and permitting services for the roadway and intersection improvements along Williams Road at Atlantic…

SR 679 (Pinellas Bayway) Structure E over Intracoastal Waterway, Design-Build (D/B)

Pinellas County, FL

As a partner to American Bridge Company and American Consulting Professionals, KCA was selected for the SR 679 (Pinellas Bayway) Structure E over the Intracoastal…