Skip to Content

Honoring our past. Designing our future. Welcome to KCA’s new look.

HomeProjects

CR 54 (Wesley Chapel Boulevard) from N. of SR 56 to N. of Magnolia Boulevard

Road with a grass median and left-turn arrow sign
CR 54 Chapel Blvd
Road with a single car, bordered by a stone wall and trees
CR 54 Chapel Blvd

This project will widen CR 54 from a two-lane undivided rural roadway to a six-lane divided urban section from approximately 0.5 mile north of SR 56 to 640 feet north of Magnolia Boulevard. The length of the project is 3.1 miles. Three intersections will be signalized including signalization interconnect. The box culvert at Cabbage Swamp will be replaced with bridge structures to improve hydraulics and provide a dry shelf wildlife crossing. In addition to roadway and structural design, we provide right-of-way (R/W) and topographic surveys, drainage and stormwater design, environmental permitting and mitigation, utility coordination, geotechnical investigations, and support for signing and pavement markings (S&PM).

Focus Areas

  • Roadway Design
  • Structures Design
  • Hydraulics Design
  • Environmental Services
  • Traffic Engineering

Recent Projects

Williams Road Southern Swale Analysis

Estero, FL

As part of the Willliams Road Improvements, KCA is assisting with drainage and stormwater analysis and maintenance of the southern swale along Williams Road from…

Williams Road Roundabout

Estero

KCA was selected by the Village of Estero to provide design and permitting services for the roadway and intersection improvements along Williams Road at Atlantic…

SR 679 (Pinellas Bayway) Structure E over Intracoastal Waterway, Design-Build (D/B)

Pinellas County, FL

As a partner to American Bridge Company and American Consulting Professionals, KCA was selected for the SR 679 (Pinellas Bayway) Structure E over the Intracoastal…