Bob Sikes Bridge Emergency Repair
Owner:
Escambia County, FL
Location:
Escambia County, FL
KCA was under contract to perform design and post-design services for the Bob Sikes Bridge for Escambia County, FL. During construction Hurricane Sally made landfall just west of Pensacola and washed out and completely undermined the bridge approaches. The bridge that leads to Pensacola Beach had to be closed to traffic due to the damage. KCA staff responded within 24 hours after the storm has passed. Our experienced emergency staff was able to inspect the damage and develop a design to open the bridge up to full traffic within four days.
Focus Areas
- Structures Design
- Emergency Response
- Bridge Inspection
Recent Projects
Williams Road Southern Swale Analysis
Estero, FL
As part of the Willliams Road Improvements, KCA is assisting with drainage and stormwater analysis and maintenance of the southern swale along Williams Road from…
Williams Road Roundabout
Estero
KCA was selected by the Village of Estero to provide design and permitting services for the roadway and intersection improvements along Williams Road at Atlantic…
SR 679 (Pinellas Bayway) Structure E over Intracoastal Waterway, Design-Build (D/B)
Pinellas County, FL
As a partner to American Bridge Company and American Consulting Professionals, KCA was selected for the SR 679 (Pinellas Bayway) Structure E over the Intracoastal…