Skip to Content

Honoring our past. Designing our future. Welcome to KCA’s new look.

HomeProjects

19th Avenue NE Widening – US 41 to US 301 PD&E Study

Owner: Hillsborough County, FL
Location: Hillsborough County, FL
Aerial view of an intersection with traffic, gas station, and nearby residential area
19th Ave. NE Widening
Aerial view of a wide road with surrounding greenery, houses, and water bodies under a clear blue sky
19th Ave. NE Widening
Aerial view of a suburban neighborhood with a large, empty dirt lot, newly paved roads, and houses
19th Ave. NE Widening
Aerial view of suburban road intersection with surrounding houses and greenery
19th Ave. NE Widening
Aerial view of busy intersection with ongoing construction and surrounding suburban area
19th Ave. NE Widening
Aerial view of a busy intersection near a suburban neighborhood with ongoing road construction and traffic
19th Ave. NE Widening
Aerial view of a crossroads under construction with vehicles and surrounding residential area
19th Ave. NE Widening
Aerial view of busy intersection with McDonald's, Taco Bell, and gas station surrounded by greenery
19th Ave. NE Widening
Aerial view of a busy intersection with surrounding greenery, buildings, and a gas station on the left
19th Ave. NE Widening
Aerial view of a multi-lane intersection with surrounding greenery, housing, and a gas station
19th Ave. NE Widening

KCA was selected by Hillsborough County to evaluate improvements along 19th Avenue NE. This PD&E study involved widening a two-lane undivided road to provide a four-lane divided facility with enhanced pedestrian, bicycle, and transit facilities. This project required widening the existing two-lane I-75 overpass or constructing a new overpass spanning the interstate. This improvement impacts I-75’s limited access right-of-way (R/W). KCA developed PD&E documents and 30% design plans. The KCA team ensured our conceptual design met Hillsborough County’s Vision Statement (provide enhanced roadway corridors with improved safety, mobility, and congestion relief through a context and environmentally sensitive design, which is supported by community and key project stakeholders). Additionally, KCA assisted with the required airspace agreement, which was signed by the County Administrator and approved by FDOT and Federal Highway Administration (FHWA).

Focus Areas

  • PD&E
  • Traffic Engineering
  • Environmental Services
  • Roadway Design
  • Structures Design
  • Hydraulics Design

Recent Projects

Williams Road Southern Swale Analysis

Estero, FL

As part of the Willliams Road Improvements, KCA is assisting with drainage and stormwater analysis and maintenance of the southern swale along Williams Road from…

Williams Road Roundabout

Estero

KCA was selected by the Village of Estero to provide design and permitting services for the roadway and intersection improvements along Williams Road at Atlantic…

SR 679 (Pinellas Bayway) Structure E over Intracoastal Waterway, Design-Build (D/B)

Pinellas County, FL

As a partner to American Bridge Company and American Consulting Professionals, KCA was selected for the SR 679 (Pinellas Bayway) Structure E over the Intracoastal…