Skip to Content

Honoring our past. Designing our future. Welcome to KCA’s new look.

HomeProjects

US 92/SR 600/ Gandy Boulevard (East of 4th Street to Westshore Boulevard)

Owner: FDOT District Seven
Location: Pinellas County, FL
Aerial view of a long bridge over a large body of water, with lush greenery, parked construction vehicles, and equipment nearby
US 92/SR 600 Gandy Blvd.

KCA was selected by FDOT District Seven to conduct a PD&E study for Gandy Boulevard from East of 4th Street North in Pinellas County to Westshore Boulevard in Hillsborough County as well as prepare 15% Line and Grade design for the project segment from 4th Street North to west of the Gandy Bridge. The contract has an option for additional design services necessary to accelerate the project development. This project’s purpose is to reduce traffic congestion and improve bicycle and pedestrian accommodations along Gandy Boulevard including the existing eastbound and westbound bridges. The improvements will extend the existing controlled access facility on Gandy Boulevard and connect to the Selmon West Extension in Hillsborough County. The 7-mile, four-lane divided facility is classified as an urban principal arterial and is part of FDOT’s Strategic Intermodal System (SIS). The PD&E will evaluate improvements including grade separations at major intersections and widening Gandy Boulevard to six lanes. Bridge widening and/or replacement will also be evaluated as part of this project. KCA will develop three alternatives, analyze the need for managed lanes, and assess the project’s impact on the social, economic, cultural, natural, and physical environment.

Focus Areas

  • PD&E
  • Hydraulics Design
  • Roadway Design
  • Structures Design

Recent Projects

Whiting Street Improvements

Tampa, FL

As part of the Tampa Hillsborough Expressway Authority’s efforts to enhance mobility and connectivity in Downtown Tampa, KCA is serving as the lead designer for…

Emergency Express Design-Build Bridge Replacements

Columbus, NC

Tara Group of Lumberton, Inc. (Tara Group) and KCA partnered to perform an emergency express design-build (D-B) bridge replacement in NCDOT Division 6 after Hurricane…

SR 417 Widening from Narcoosee Road to North of SR 528 (CFX 417-150)

Orange County, FL

This $100 million CEI project consists of widening SR 417 from four general use lanes to six general use lanes and two part-time shoulder running…