Skip to Content

Honoring our past. Designing our future. Welcome to KCA’s new look.

HomeProjects

US 41 at CSX Grade Separation S. of Causeway Boulevard

Owner: RK&K/FDOT District Seven
Location: Hillsborough County, FL
Aerial view of highway overpass, labeled "St Paul St," with surrounding industrial area and railway tracks
Aerial view of US41-DDI highway interchange with looped ramps and overpass surrounded by green spaces, residential, and industrial areas
Rendering of overpass at US 41
US 41 railroad crossing with traffic lights and cars on a busy road
Current conditions at US 41 CSX railroad crossing.

As a major subconsultant responsible for roadway and structures design, KCA was selected by FDOT District Seven for the US 41 at CSX Grade Separation project. The project improves level of service (LOS) along US 41 by providing grade separation at the CSX railroad crossing and the intersection of Causeway Boulevard.

US 41/SR 45 and SR 676/Causeway Boulevard are critical arterial corridors serving the City of Tampa and greater Hillsborough County. The project is being delivered using FDOT’s Statewide Acceleration Transformation (SWAT) process, which allows key design activities, including survey, geotechnical investigations, concept development, wetland determinations, pond siting, and noise analysis, to advance concurrently with Project Development and Environment (PD&E) efforts.

KCA is providing roadway design, signalization, maintenance of traffic (MOT), signing and pavement marking (S&PM), structures design, and drainage design services for the project.

Focus Areas

  • PD&E
  • Traffic Engineering
  • Structures Design
  • Hydraulics Design

Recent Projects

Whiting Street Improvements

Tampa, FL

As part of the Tampa Hillsborough Expressway Authority’s efforts to enhance mobility and connectivity in Downtown Tampa, KCA is serving as the lead designer for…

Emergency Express Design-Build Bridge Replacements

Columbus, NC

Tara Group of Lumberton, Inc. (Tara Group) and KCA partnered to perform an emergency express design-build (D-B) bridge replacement in NCDOT Division 6 after Hurricane…

SR 417 Widening from Narcoosee Road to North of SR 528 (CFX 417-150)

Orange County, FL

This $100 million CEI project consists of widening SR 417 from four general use lanes to six general use lanes and two part-time shoulder running…