Skip to Content

Honoring our past. Designing our future. Welcome to KCA’s new look.

HomeProjects

Turkey Creek Road Improvement Project CEI

Service: CEI
Owner: Hillsborough County
Location: Plant City, FL
Excavation site with a backhoe and bulldozer clearing earth on a sunny day
Turkey Creek Road
Construction site on a dirt road with a yellow Caterpillar bulldozer
Turkey Creek Road
Road closed sign and detour with orange barrels on Turkey Creek Road
Turkey Creek Road

KCA provided CEI services for this contract for the widening of Turkey Creek Road in Plant City. These improvements included the addition of a center turn lane, the realignment and signalization of Airport Road, and the installation for both water and sanitary sewer facilities. The work consisted of widening, milling, and resurfacing, muck removal and surcharging, construction of retention ponds with liners, mast arm signals and other miscellaneous items.

Focus Areas

  • CEI
  • Roadway Design

Recent Projects

Whiting Street Improvements

Tampa, FL

As part of the Tampa Hillsborough Expressway Authority’s efforts to enhance mobility and connectivity in Downtown Tampa, KCA is serving as the lead designer for…

Emergency Express Design-Build Bridge Replacements

Columbus, NC

Tara Group of Lumberton, Inc. (Tara Group) and KCA partnered to perform an emergency express design-build (D-B) bridge replacement in NCDOT Division 6 after Hurricane…

SR 417 Widening from Narcoosee Road to North of SR 528 (CFX 417-150)

Orange County, FL

This $100 million CEI project consists of widening SR 417 from four general use lanes to six general use lanes and two part-time shoulder running…