Skip to Content

Honoring our past. Designing our future. Welcome to KCA’s new look.

HomeProjects

SR 595 (Alt US 19) Resurfacing from Whisper Lake Road to Meres Boulevard

Owner: FDOT District Seven
Location: Pinellas County, FL
Construction workers install large pipes in an excavated trench, with machinery in the background
SR 595
Curb under construction beside road with orange barrels and "No Parking" sign
SR 595
Construction workers smoothing freshly poured concrete on a sidewalk; Fairway Pizza sign in background
SR 595
Construction site on South Pinellas Avenue with traffic cones and utility warning markers. Date and coordinates displayed
SR 595
Construction site with workers and a digger at Tarpon Springs Golf Course, yellow trench boxes, and visible pipes
SR 595

This resurfacing, restoration, and rehabilitation (RRR) project consists of milling and resurfacing a 5.395-mile-long, 2-lane (with median turn lane), urban section of SR 595. The project will also widen and resurface a 0.225-mile-long urban section of SR 595 to include new median turn lanes. The project also includes cross slope corrections, new drainage installation, curb and gutter installation, concrete sidewalk and curb ramp construction, Utility Work by Highway Contractor Agreement (UWHCA) with the City of Tarpon Springs, roadway and shoulder widening, asphalt driveway reconstruction, traffic separators, aluminum pipe guiderail, guardrail reset and end treatments, gravity wall, signalization upgrades (pedestrian and vehicular), thermoplastic (standard and preformed), signing, and performance turf.

Focus Areas

  • CEI
  • Roadway Design
  • Structures Design
  • Traffic Engineering

Recent Projects

Whiting Street Improvements

Tampa, FL

As part of the Tampa Hillsborough Expressway Authority’s efforts to enhance mobility and connectivity in Downtown Tampa, KCA is serving as the lead designer for…

Emergency Express Design-Build Bridge Replacements

Columbus, NC

Tara Group of Lumberton, Inc. (Tara Group) and KCA partnered to perform an emergency express design-build (D-B) bridge replacement in NCDOT Division 6 after Hurricane…

SR 417 Widening from Narcoosee Road to North of SR 528 (CFX 417-150)

Orange County, FL

This $100 million CEI project consists of widening SR 417 from four general use lanes to six general use lanes and two part-time shoulder running…