Replace three Bridges on Service Road inside Dominion Energy Plant within Cope Energy Generation Plant
Full-service bridge replacement project including roadway, hydrology/hydraulics, stream/wetland delineation, and structure design. This project was complicated due to the lack of existing hydraulic modeling, as well as construction access. KCA used SRH 2D to more accurately model the drainage to the creek at design storms, designing foundations for proposed scour.
Focus Areas
- Bridge Inspection
Recent Projects
Whiting Street Improvements
Tampa, FL
As part of the Tampa Hillsborough Expressway Authority’s efforts to enhance mobility and connectivity in Downtown Tampa, KCA is serving as the lead designer for…
Emergency Express Design-Build Bridge Replacements
Columbus, NC
Tara Group of Lumberton, Inc. (Tara Group) and KCA partnered to perform an emergency express design-build (D-B) bridge replacement in NCDOT Division 6 after Hurricane…
SR 417 Widening from Narcoosee Road to North of SR 528 (CFX 417-150)
Orange County, FL
This $100 million CEI project consists of widening SR 417 from four general use lanes to six general use lanes and two part-time shoulder running…