Skip to Content

Honoring our past. Designing our future. Welcome to KCA’s new look.

HomeProjects

CR 54 (Wesley Chapel Boulevard) from N. of SR 56 to N. of Magnolia Boulevard

Road with a grass median and left-turn arrow sign
CR 54 Chapel Blvd
Road with a single car, bordered by a stone wall and trees
CR 54 Chapel Blvd

This project will widen CR 54 from a two-lane undivided rural roadway to a six-lane divided urban section from approximately 0.5 mile north of SR 56 to 640 feet north of Magnolia Boulevard. The length of the project is 3.1 miles. Three intersections will be signalized including signalization interconnect. The box culvert at Cabbage Swamp will be replaced with bridge structures to improve hydraulics and provide a dry shelf wildlife crossing. In addition to roadway and structural design, we provide right-of-way (R/W) and topographic surveys, drainage and stormwater design, environmental permitting and mitigation, utility coordination, geotechnical investigations, and support for signing and pavement markings (S&PM).

Focus Areas

  • Roadway Design
  • Structures Design
  • Hydraulics Design
  • Environmental Services
  • Traffic Engineering

Recent Projects

Whiting Street Improvements

Tampa, FL

As part of the Tampa Hillsborough Expressway Authority’s efforts to enhance mobility and connectivity in Downtown Tampa, KCA is serving as the lead designer for…

Emergency Express Design-Build Bridge Replacements

Columbus, NC

Tara Group of Lumberton, Inc. (Tara Group) and KCA partnered to perform an emergency express design-build (D-B) bridge replacement in NCDOT Division 6 after Hurricane…

SR 417 Widening from Narcoosee Road to North of SR 528 (CFX 417-150)

Orange County, FL

This $100 million CEI project consists of widening SR 417 from four general use lanes to six general use lanes and two part-time shoulder running…