19th Avenue NE Widening – US 41 to US 301 PD&E Study
KCA was selected by Hillsborough County to evaluate improvements along 19th Avenue NE. This PD&E study involved widening a two-lane undivided road to provide a four-lane divided facility with enhanced pedestrian, bicycle, and transit facilities. This project required widening the existing two-lane I-75 overpass or constructing a new overpass spanning the interstate. This improvement impacts I-75’s limited access right-of-way (R/W). KCA developed PD&E documents and 30% design plans. The KCA team ensured our conceptual design met Hillsborough County’s Vision Statement (provide enhanced roadway corridors with improved safety, mobility, and congestion relief through a context and environmentally sensitive design, which is supported by community and key project stakeholders). Additionally, KCA assisted with the required airspace agreement, which was signed by the County Administrator and approved by FDOT and Federal Highway Administration (FHWA).
Focus Areas
- PD&E
- Traffic Engineering
- Environmental Services
- Roadway Design
- Structures Design
- Hydraulics Design