US 421/I-40 Business (Salem Parkway) in Winston-Salem, Division 9, Forsyth County, NC
KCA provided Lead CEI Technicians under the Statewide On-Call contract for this $99.2 million D/B project, which received a Grand Award in the national 2021 ACEC engineering excellence awards competition. The project consisted of grade changes with pavement reconstruction, redesigning entrance and exit ramps, replacing nine vehicular bridges and two pedestrian bridges, lengthening acceleration and deceleration lanes between ramps, widening existing roadway shoulders and adding new shoulders, building portions of a multi-use path from Lockland Ave., to Liberty Street, and renaming all of the US 421/Business 40 to Salem Parkway. KCA also inspected several signal installations, fiber-optic installations and intersection change outs including I-40 Business (Salem Parkway)
- Construction Engineering & Inspection
- Bridge Maintenance Inspection
- Structures Design
Focus Areas
B-5988 Burns Street Bridge Replacement-Division 10 LAP Oversight Contract, Town of Wadesboro, NC
Town of Wadesboro, NC
I-3802A, Widening of I-85 from North of NC 73 to North of Lane Street in Division 10, Cabarrus/Rowan Counties, NC
Rowan Counties, NC
Replace Three Bridges on Service Road Inside Dominion Energy Plant within Cope Energy Generation Plant, Cope, SC
Cope, South Carolina