KCA provided Lead Technicians and multiple support staff under Statewide On-Call contracts for this $107.9 million D/B project that widened I-85 from four to eight lanes with concrete pavement. The NC 152/I-85 interchange has a new bridge over I-85 and two new ramps constructed on the north side, NC 152 widened, and three roundabouts were constructed. NC 152 has new bridges over US 29 and the North Carolina Railroad. Daugherty, Lentz and Pine Ridge Roads have new bridges over I-85. A new interchange was constructed at Old Beatty Ford Road, which included a new bridge over I-85 and a ramp bridge.
- Roadway Design
- Bridge Replacement
- Traffic Design
Focus Areas
1st
FDOT Phased Design-Build
7
Days to Restore Access for Emergency Personnel
15
Days to Reconnect a Community
5
Project of the Year/Best Project Awards
B-5988 Burns Street Bridge Replacement-Division 10 LAP Oversight Contract, Town of Wadesboro, NC
Town of Wadesboro, NC
KCA was tasked with providing CA services, including CEI and materials inspections, for the construction of the Burns Street Bridge Replacement project. The work was…
Construction Engineering & Inspection
Roadway Design
Structures Design
Traffic Engineering
Replace Three Bridges on Service Road Inside Dominion Energy Plant within Cope Energy Generation Plant, Cope, SC
Cope, South Carolina
Full service bridge replacement project including roadway, hydrology/hydraulics, stream/wetland delineation, and structure design. This project was complicated due to the lack of existing hydraulic modeling,…
Hydraulics Design
Structures Design
Roadway Design
NCDOT Low-Impact Bridge Replacements – Statewide – Federal Funding
North Carolina
Over the last ten years, KCA has planned and designed over thirty Division bridge projects. These projects consists of pre-construction activities for planning, natural and…
Bridge Maintenance Inspection
Roadway Design
Environmental Services
Structures Design
Emergency Response