2017 Feasibility Study Express Design LSC And 2019 And 2021 Feasibility Studies LSC
Since 2017, KCA has completed approximately 25 Feasibility Studies and currently has three active FS projects with NCDOT. They are as follows:
H183917 – Modernization of US 64 from US 276 to Windsor Drive, Transylvania and Henderson Counties
H230721 – Orange Grove Road Widening in Orange County
H231407 – Glenburnie Road and Amhurst Blvd. intersection improvements in Craven County KCA completed the review of upgrading US 52 to an interstate facility from just south of Clemonsville Road H090370 (U-2826) to the Winston-Salem northern beltway and then continuing to I-77 in Surry County (H090022). The H090370 and a portion of the H090022 studies were subsequently broken out into six separate studies which included (FS H184836, H190643, H190715, H190716, H190718, and H192270). In addition, KCA has previously completed a Feasibility Study to add an interchange at US 52 and Trinity Church Road
(FS-111166) near the end of 2017.
- Roadway Design
- Traffic Design
Focus Areas
B-5988 Burns Street Bridge Replacement-Division 10 LAP Oversight Contract, Town of Wadesboro, NC
Town of Wadesboro, NC
I-3802A, Widening of I-85 from North of NC 73 to North of Lane Street in Division 10, Cabarrus/Rowan Counties, NC
Rowan Counties, NC
Replace Three Bridges on Service Road Inside Dominion Energy Plant within Cope Energy Generation Plant, Cope, SC
Cope, South Carolina